Skip to main content
Cost Estimationsimple~10 seconds

Structural Package → BOQ Cost Estimate

Pick a completed Structura structural package → IS 1200 bill of the structural works (structural steel by weight, CFT infill, RCC cores, foundations, rebar from the schedule, the measured civil take-off) priced at CPWD rates for the project's city → downloadable BOQ spreadsheet with M/L/E breakdown.

Pipeline

3 nodes · 2 connections
Complexity: simple
Run time: ~10 seconds

Tags

structurastructuralsteelboqcostquantitiesis1200

Required Inputs

  • A completed Structura job

Expected Outputs

  • Structural works BOQ with IS 1200 codes and unit rates
  • The same total as the studio's cost estimate
  • Downloadable XLSX/CSV

Ready to try this workflow?

Sign up free and run this template in under 60 seconds.

Sign Up Free →